Engineering investigations and decisions

Construction evidence and traceability

Keep originals and record where, when and by whom evidence was collected.

Civil Engineering Jobs editorial team

The method

Keep originals and record where, when and by whom evidence was collected. Link measurements, photographs and samples to drawing revisions and physical locations. Preserve a record of transfers and transformations.

A worked situation

Conflicting construction documents may refer to different revisions, dates or work limits. Compare the specification, transmittal, approved change and field record before interpreting the discrepancy.

Put it to work

Trace one conclusion back to its original documents. Identify which part is a technical finding and which depends on interpreting contractual obligations.