Predictive modelling of construction defects
Define a defect consistently, specify the prediction horizon and use only inputs available at prediction time.
Civil Engineering Jobs editorial team
The method
Define a defect consistently, specify the prediction horizon and use only inputs available at prediction time. Validate on different projects or later time periods, and check calibration as well as ranking performance.
A worked situation
For premature concrete deterioration, compare exposure, curing records and material data. Inspections may be more frequent on already suspect projects, so recorded defect counts can reflect surveillance as well as actual performance.
Put it to work
Compare predicted probabilities with observed rates in groups, and report false alarms and missed defects at the threshold used to select inspections.